Messages
Hei p? dere.
Som jeg informerte om p? fredag s? synes vi at dere har jobbet veldig bra, ogs? med siste prosjekt. De aller fleste er i m?l, og vi har valgt ? si ?vel bl?st? eller hva det n? heter. Alle har n? f?tt godkjent kurset.
Mange har eksamener i andre kurs n? og vi lar prosjekt 3C v?re frivillig. De som vil CNC frese f?r gj?re det. Labben vil v?re ?pen i noen uker framover + til h?sten (for INF4500 studenter), og har dere en del dere vil lage er det bare ? si i fra til matsh@ifi.uio.no, eller ?yvind, evt. T?nnes s? s? vi p? saken i lag. Freser p? labben kan dere ogs? bruke ogs? uten ? si i fra, men pass p? ? ikke ?delegge ting, inkludert dere selv :)
Det ble mange flotte roboter i ?r, og jeg jobber med ? oppdatere HOF siden. Diplomer kommer ogs? snart.
Lykke til p? eksamener, god sommer og god fresing!
Mvh
Mats, ?yvind, Georgi
INF4500-V16
1) Midimill is ready for use with foam.
2) ?yvind is refreshing the Robinrouter to 2.5mm pitch (faster)
Scheduled finish - beginning of next week
3) The ISEL router may be available for suitable (very small) projects in aluminium or plastic. (Only operated by Mats) (Will not use the 3B machine controller)
Found by Yngve :
Before startup:
Local machine: Start menu - type cmd - paste in
regedit.exe /s \\bifrost\project0\robin\CADlib\HSMworks\HSMWorks.reg
(right mouse click for paste)
Due to many software problems:
2C : you can just submitt the *.obj file from Blender (no SolidWorks import)
(but then you loose some of the fun)
You can try to use software OpenGL:
SolidWorks with no open document :
Tools - Options - Performance - use software OpenGL
Some info
This Friday training exercises will be dedicated to testing and lab work
Presentation of project
1B part 1
1C part 1
1D part 1
in plenum will be as scheduled 30.mars.
Minimum 1 member of each group must make a short presentation of the
1) SolidWorks files for the silicone cast,
2) SolidWorks files of full robot assembly
3) Video of assembly simulation
Presentations wlll be based on Devilry file submissions
Due to printer hardware problems this year we have set a new deadline for project:
1D part 2,3
1E part 1,2
1F part 1
to 13. april, time: 10.15 at the expert panel demonstration
The deadline for 1A, 1B,1C and 1D part 1 is today 29.3
All print to the Fortus machine must be submitted today. (Only spare parts can be submitted later)
Needless to say: all robots must be able to walk/jump/whatever at the expert panel demonstration.
-------------
For those of you that made it to the original deadline: CONGRATULATIONS, you have now deserved the "free time". You are noticed.
Due to some printer meltdown problems, the Objet printer will be used if the
Ultimakers are occupied.
Just mail the STL files to the TA (next week: Georgi, since ?yvind will be away)
Blender can be run by pasting this link in the start menu on a IFI PC
We have used a little more time on details, and are therefore one week behind schedule.
Tomorrow 4. mars we will do
http://heim.ifi.uio.no/matsh/inf4500/lec/html6/2.php
Please send
.SLDPRT file to Devilry not .STL files
STL files do not contain any design process information
Latest attempt from USIT
https://www.winprog.uio.no/programmer/Solidworks/
You can use the transparent boxes labeled with your group numbers in the locker at the ROBIN lab
The card writers in the PCs at ROBIN lab is not working (missing correct drivers)
We will use the mobile reader/writer at the lab
If you can meet at both intervals (12-14) / (14-16), please flip a coin and choose one of the intervals at random. We will then see how crowdy it will be and if we need to make a reservation list or not.
It is good if you can bring your own laptop with you (not a requirement)
Plan:
0) Assembly of more project groups
1) Get access to the lab door (by Yngve Hafting)
2) Sign a lab agreement form (by Yngve Hafting)
3) Sign out Dynamixel servos (by Yngve Hafting)
4) Look at free SolidWorks licenses for students
5) Continue working with SolidWorks
6) Start using the Ultimaker printers and test print project 1A parts
7) Robin Lab tour
We will use SolidWorks 2015 - not 2013
In CHILL the following machines are not yet set up with 2015:
Brusletten
Faremo
Giske
Listau
Lorentzen
The plugin HSMworks is not set up yet so at SolidWorks startup:
click "cancel" and "no" at every question about HSMworks licensing
Det er n? kj?rt opptak. Noen st?r p? venteliste, det kan bli tatt opp fra venteliste. Da vil det bli gitt beskjed.
Oversikten her p? de offisielle UIO sidene er ikke helt riktig, og jeg har ikke rettigheter til ? forandre den :)
All info for kurset finner dere ogs? her: