fourMs Lab Meeting

Agenda

  • Introduction
    • Introduction of people (if necessary)
    • Check minutes from last meeting
    • Agree on agenda
    • Agree on secretary
  • Current state of the setup
    • Door, Ventilation, Heating, Electrical, Network
  • VDI Tutorial

Minutes

  • Introduction
    • Rahul presented himself as the new EEG lab engineer
  • Status:
    • Door: problems with the door. Use the emergency exit button.
    • Ventilation: still not working properly. There is also an issue with the heating.
    • Electricity: still problems with BNC and XLR.  
    • Network: internal lab network working. Problems with external network.
    • VDI: almost working. Let Kayla know about problems.
    • Optitrack: new system working
    • Delsys: should be able to sync with Optitrack
    • Max 8 licenses are available
  • VDI
    • Try these instructions to test